News Archive
Pumps for Wellpoint Dewatering at a Construction Site
This member of your construction team gets no lunch breaks or sick days. Choosing the right solution for this 24/7 worker is critical. It’s been around for more than a century, and the wellpoint process for predrainage is still going strong. This system is cost effective, and it’s optimal for
Getting to Dry Land
Big construction and unforeseen water obstacles don’t mix well. Here are some guidelines for choosing the right pump for the job. Move that water out of the way. It’s often the first thing that that needs to be done on construction sites, or after an area is flooded because
Keeping Miami Beach Flood Free
Miami Beach residents hope new pumps handle floodwaters The city of Miami Beach, Florida has experienced many changes over the past few years, including constant flooding due to the King Tide of October as well as due to the remnants of passing tropical storms. The City decided to embark on
Lake Okeechobee Water Transfer
Lake Okeechobee Water Transfer We recently completed a job for a construction company near Lake Okeechobee. It consists of 8 of our Hydraflo™ water pumps connected to a combined 6,400 feet of pipe with a 30 inch discharge diameter. The reason for this job is to bide time for the nearby pump station
Brand X
In another successful refurbishment and repair project, MWI Pumps worked with a local water management agency to repair a brand new, but dysfunctional pump. The pump, which was used in flood control for an orange grove, was recently purchased brand new by the client. The client ran “Brand X” pump for
Water District Pump Repair
MWI Pumps handles many clients across the U.S., and when a water district approached MWI to repair a continually failing pump, the team jumped at the chance to solve the problem. The client had a pump used to pump water into a reservoir for cleaning before it went back into